Diesel generator set output voltage is unstable solution - used generators


Generator operator must take responsibility for the care of turbine generator sets in the course of. The following is a need to follow some rules operator, so generators can provide you with the best service. The operator at the unit during use, especially in the first 100 hours of work within the following regulations shall operate, so generators to get the longest life.
Operational use
■ allow generators to work as long as possible in 75% of the load range.
■ Avoid idling time generator leader or at maximum power for more than 5 minutes.
■ closely monitor the operation of the generator set when the instrument to develop the habit, if the oil temperature reaches 121oC or coolant temperature exceeds 88oC should immediately reduce the load.
■ Within walking together during the oil once every 10 hours to check the plane. - Generator maintenance
■ turbine fuel must meet national standards (GB252) performance of the domestic number "0" or "---- 10" number of light diesel oil.
■ Cummins engine oil should be used in the recommended oil (15W / 40CD, CE, CF, CH, etc.)
■ After the start should be at idle or not more than 1000r / min of conditions main oil until hot car engine oil pressure is stable.
■ When you start, you can not fire within 30 seconds if continuous. To wait until two minutes after the start.
■ idle for 3-5 minutes after start-up requirements: After the engine starts, between the crankshaft and bearings, re-established between the piston and cylinder liner film will take some time, the optimum gap between the moving parts in the engine temperature reaches only a timing to work properly, it is not in a hurry to start the beginning of the pull-power, high torque or high speed so as not to bite the piston in the cylinder or the bearings dry friction. - Generator maintenance
■ before stopping first 1-2 minutes after uninstalling the no-load operation and require idle for 3-5 minutes, mainly to allow the lubricant away the heat of the combustion chamber, bearings and seals, etc.; in particular turbocharger, if all of a sudden stop, the possibility of bearings and oil seals killed great.
■ unit operation there is any abnormal phenomenon should immediately stop turbine overhaul. Such as: a sudden drop in oil pressure, the sound is not normal and so on.
■ For a standby generator set, at least a month to start the engine run once (about half an hour).
■ Before each start generators, must check the engine oil level, cooling water level.
■ battery backup units should be regularly charged while checking the battery level. - Generator maintenance
■ units in operation to remove the battery is strictly prohibited.

- Diesel Generator Co., Ltd. of Dongguan City is a franchise generator maintenance, used generator maintenance, generator maintenance, generator maintenance, Dongguan, used generators and spare parts production, sales, maintenance and technical services integration production management company.

Home / Company / Products / Case / Engineering / Mute / Maintenance / Feedback / Contact
Dongguan zhongchai Power equipment co., LTD all rights reserved @ Copyright 【BMAP】【GMAP
Customer service center:+86-18925428999  FAX:+86-769-82027599 Access amount:
*All of photos, text and other information contained in the website are reserved by
Dongguan zhongchai Power equipment co., LTD and it is not allowed make reproduction without consent * [Background management]